LEED GA Practice Questions: LEED Process August 31, 2026 Posted by 3FOLD No comments Welcome to the LEED Green Associate practice quiz. Enter your details, then work through all 15 questions — we'll email you the score and a full explanation for every question. Full Name Email Mobile Number In what year was USGBC founded, and what kind of organisation is it? A. 1998, a government agency B. 1993, a non-profit C. 2000, a for-profit certification body D. 2008, a trade association None What are Minimum Program Requirements? A. The prerequisites within each credit category B. Gateway eligibility rules a project must satisfy to use LEED at all C. The minimum number of points needed to certify D. The documentation required at final review None Which of these is not a Minimum Program Requirement? A. The project must be on existing, permanent land B. The project must use a reasonable LEED project boundary C. The project must achieve at least 40 points D. The project must commit to sharing energy and water usage data None A team is deciding between BD+C and ID+C for a project. What guidance does the 40/60 rule give them? A. Use the system that covers at least 60% of the project; if none covers 40%, LEED may not be appropriate B. Split the project 40/60 between two rating systems C. Pursue 40 points under one system and 60 under the other D. Certify 60% of the floor area None Which rating system family suits a tenant fitting out leased office space? A. BD+C B. ID+C C. O+M D. ND None How are points distributed between LEED credits? A. Evenly, so every credit is worth the same B. By how difficult the credit is to achieve C. By how much the credit costs to document D. By the expected environmental and human health impact of the credit None What are the three impact areas that LEED v5 is organised around? A. Energy, water and waste B. Design, construction and operation C. Prerequisites, credits and bonus points D. Decarbonization, quality of life, and ecological conservation and restoration None Who awards LEED certification to a project? A. GBCI B. USGBC C. The project's LEED AP D. The local authority None Put the certification process in order. A. Document, register, review, certify B. Review, register, document, certify C. Register, document, submit and review, certify D. Register, certify, document, review None What is the difference between a standard review and a split review? A. Standard review is for new construction; split review is for existing buildings B. Split review costs less C. Standard review submits the whole application at once; split review submits design credits first and construction credits later D. Split review applies only to Platinum projects None A project team is unsure how a credit requirement applies to their unusual building. Where should they look first? A. Ask another project team B. The LEED Interpretations database and published addenda C. Submit the project and see what the reviewer says D. Choose a different credit None Which of the following is a benefit of LEED certification that the exam expects you to recognise? A. Lower operating costs through reduced energy and water use B. Exemption from local building codes C. A guaranteed increase in property value D. Faster planning approval in all jurisdictions None How is the LEED rating system developed and updated? A. By a USGBC committee working privately B. By GBCI, based on certification data C. Through an open, consensus-based process involving stakeholders and volunteers, with member approval D. By government mandate None How many base points are available in a typical LEED rating system, and what sits above that? A. 100 base points, with up to 10 bonus points B. 110 base points with no bonus C. 80 base points, with 20 bonus D. 100 points with no bonus available None A project meets every prerequisite but earns only 37 points. What happens? A. It certifies at Certified level B. It certifies but with no level awarded C. It is automatically resubmitted D. It does not achieve certification None Time's up No comments Share 0
Leave a reply