Why the Wrong Answers Are Wrong: Ten Tricky LEED GA Questions August 31, 2026 Posted by 3FOLD No comments Welcome to the LEED Green Associate practice quiz. Enter your details, then work through all 10 questions — we'll email you the score and a full explanation for every question. Full Name Email Mobile Number 1.A project is described as LEED Platinum. What does that tell you? A. Someone on the project team holds the highest level of LEED credential B. The project achieved every credit available in its rating system C. The building earned 80 or more points in its certification review D. The project used only certified sustainable materials None 2.Which statement about a prerequisite is correct? A. Every project pursuing that rating system must meet it, and it earns no points B. It earns more points than an ordinary credit because it is mandatory C. It is strongly recommended but optional D. It applies only to projects targeting Gold or Platinum None 3.A colleague tells you she is "LEED certified". What is she most likely to mean? A. She has personally certified a building under LEED B. She is employed by GBCI as a reviewer C. The office she works in holds LEED certification D. She holds a LEED credential and has used the wrong word None 4.Demand-controlled ventilation improves air quality without wasting energy by: A. Running supply fans continuously at maximum output B. Matching outdoor airflow to actual occupancy, usually through CO2 sensors C. Recirculating indoor air without introducing outdoor air D. Reducing outdoor air to a fixed minimum regardless of occupancy None 5.A landscape uses non-native species that thrive in the local climate with minimal irrigation. These plants are: A. Invasive species B. Native plants C. Turf alternatives D. Adapted plants None 6.Embodied carbon is: A. Emissions from manufacturing, transporting and installing materials, and from construction activity B. Emissions from the energy used to run the building day to day C. Carbon stored within timber and other bio-based products D. Emissions offset by the purchase of renewable energy None 7.A showerhead's water consumption is expressed as: A. A flush rate, measured per use B. A flush rate, measured per minute C. A flow rate, measured per minute D. A flow rate, measured per use None 8.Which of these addresses light pollution rather than the heat island effect? A. High-SRI paving across the car park B. Shielded, warmer-toned exterior lighting C. A vegetated roof over the main block D. Shade trees planted over hard surfaces None 9.A project purchases renewable energy certificates. This means: A. Renewable energy is generated on the project site B. The project's total carbon emissions have been offset C. The utility now delivers renewable power directly to the building D. The project has funded renewable generation elsewhere and can account for green power None 10.When does the integrative process deliver the most value? A. At concept stage, before decisions lock in B. During construction, when coordination issues surface C. At handover, alongside commissioning D. In operation, once real performance data is available None Time's up No comments Share 0
Leave a reply