ISO 27001 Lead Auditor Domain 5 Practice Questions: Reporting and Closing Out September 17, 2026 Posted by 3FOLD No comments Fill in the form below to unlock your ISO 27001 Lead Auditor Domain 5 Practice Questions: Reporting and Closing Out.We'll email your full results — with a detailed explanation for every question — as soon as you finish. Full Name Email Address Phone Scenario: Corvallo Diagnostics Corvallo runs four pathology laboratories processing patient samples for hospital trusts, holding patient identifiers and clinical results. It has 320 staff and is at Stage 2 of first-time certification. The audit is finished and the team is drafting its findings. At three of the four laboratories, sampled user accounts belonging to staff who had left still had active access; at the fourth, the same check was clean. Separately, the laboratory information system holds results for seven years while Corvallo's own retention schedule requires ten. Questions 1 to 4 are based on this scenario. Each one stands on its own. Question 1. (3 marks) A team member drafts this for the retention gap: “Records retention is inadequate and the laboratory system has been badly configured, which should be corrected by extending the retention period to ten years.” Judged as a nonconformity report, what is the most serious defect? A. It is written about the configuration of a system rather than about the people who are responsible for it B. It names no requirement and offers a solution, so it is neither traceable nor properly an auditor's finding C. It does not say how many records were examined, or which of the four laboratories the sample was drawn from D. It states a conclusion that the audit team has not yet formally agreed among themselves at this stage None Question 2. (3 marks) The leaver accounts at the three laboratories would each be a minor if taken on its own. How should the team grade them, and on what basis? A. Three separate minors, because each laboratory is a separate site operating under its own local administrator B. One minor, because the total number of accounts involved is small when set against the whole population sampled C. An observation at each site, because access was not actually misused by anyone who had left D. One major, because the same gap at three of four sites is a pattern rather than three isolated lapses None Question 3. (2 marks) At the end of the audit Corvallo's quality manager asks whether the retention gap could be recorded as an opportunity for improvement instead, since the shortfall is in Corvallo's own schedule rather than in the standard. How should the team leader respond? A. Decline, because the organisation's own documented requirement is an audit criterion and failing it is a nonconformity B. Agree, because a requirement the organisation set for itself is not one that ISO/IEC 27001 imposes on it C. Agree, provided the opportunity for improvement is written up with the same evidence a nonconformity would carry D. Defer the decision to the certification body, since the grading of borderline findings is not the team's to make None Question 4. (2 marks) While the report is being written, a team member proposes adding a finding about weak password rules that nobody raised with Corvallo at any point during the audit. What should the team leader do? A. Add it, since the report must record everything the team observed while on site B. Add it as an observation rather than a nonconformity, which avoids the need to have raised it C. Leave it out of this report, because nothing in the report should be new to the auditee D. Add it, but note in the report that the auditee had no opportunity to respond to it None Scenario: Marrowgate Water Services Marrowgate operates telemetry and billing systems for a regional water utility and has held certification for four years. At the last surveillance audit a major nonconformity was raised: changes were being made to the telemetry platform without any record of authorisation or testing. Marrowgate has responded with a corrective action plan, and you are the team leader for the follow-up. The plan states that the two engineers who made the unauthorised changes have been retrained and formally warned. Questions 5 to 8 are based on this scenario. Each one stands on its own. Question 5. (3 marks) Judged as a response to the major, what is wrong with Marrowgate's plan as it stands? A. Retraining is never an acceptable corrective action, because people cannot be relied upon B. The plan should have been submitted to the certification body rather than to the audit team C. Disciplinary action against named individuals falls outside what an auditor may evaluate D. It addresses the two engineers rather than the absence of any change-authorisation process None Question 6. (3 marks) Marrowgate's directors ask what the audit team's conclusions will say. Which of these belong in the audit conclusions? Choose the best three. A. The extent to which the ISMS conforms to the audit criteria B. The corrective actions Marrowgate should take to close the outstanding major C. Whether the ISMS is effectively implemented and maintained D. The team's confidence in its conclusions, given that they rest on a sample E. A ranking of the areas audited, from the strongest to the weakest Question 7. (2 marks) At the closing meeting Marrowgate's operations director says the team clearly knows the platform well, and asks the team leader to set out what a compliant change-authorisation process would look like. How should the team leader respond? A. Decline to specify the process, restate the requirement and the evidence, and leave the design to Marrowgate B. Set out the process in outline only, since general advice is not the same as designing a system C. Agree, on the basis that helping the auditee understand the requirement is part of the auditor's role D. Offer to send the specification after the audit closes, when the audit relationship has ended None Question 8. (2 marks) Marrowgate later reports that a change-authorisation procedure has been issued and all engineers briefed on it. What would be adequate evidence that the corrective action is effective? A. The issued procedure, together with the attendance record from the briefing B. A statement from the engineering manager confirming the procedure is now followed C. Authorisation and test records for a sample of changes actually made since the procedure was issued D. Confirmation that the procedure has been added to the document register and given a version number None Time's up No comments Share 0
Leave a reply