ISO 9001:2026 QMS Practice Question Set 3 October 8, 2026 Posted by 3FOLD No comments Fill in the form below to unlock your quiz.We'll email your full results — with a detailed explanation for every question — as soon as you finish. Full Name Email Address Mobile Number Q1. Which documented information is required as evidence under ISO 9001:2026? A. A mandatory quality manual describing every clause B. A mandatory organization chart for quality responsibilities C. Evidence of competence and the results of management reviews D. A documented procedure for every ISO 9001 requirement None Q2. What does "continual" indicate when used in ISO 9001:2026 in relation to improvement? A. Improvement occurs over time with possible intervals of interruption B. Improvement must occur without interruption C. Improvement is required only after nonconformities D. Improvement must follow a schedule set by top management None Q3. An auditor is assigned to audit a purchasing procedure that she personally wrote the previous year. What is the most appropriate action? A. Conduct the audit because she knows the procedure best B. Conduct the audit and ask management to review the findings C. Conduct the audit because sufficient time has passed D. Request another auditor to conduct the audit None Q4. An auditor checks whether information from a manager is supported by sampled dispatch records before drawing a conclusion. Which auditing principle is being applied? A. Confidentiality B. Evidence-based approach C. Independence D. Due professional care None Q5. A certification body receives a serious product safety complaint against a certified client and visits the client with short notice. What type of audit activity is this? A. Recertification audit B. Stage 2 audit C. Short-notice audit D. Audit for expanding scope None Q6. An auditor samples 200 batch-release forms to determine whether each has an authorized signature. Which sampling method is appropriate? A. Attribute-based sampling B. Variable-based sampling C. Judgement-based sampling D. Statistical sampling based on process performance None Q7. A contract manufacturer produces medical monitors for an organization. The organization verifies each production lot at an independent laboratory but has never communicated this verification activity to the manufacturer. Which requirement is most directly relevant? A. 8.4.2 d), determining verification needed B. 8.6, release of products and services C. 8.4.3 b), approval of products and services D. 8.4.3 f), communicating verification or validation activities to the provider None Q8. During an audit, production at the only factory becomes unavailable for two weeks because of a fire. What should the audit team leader do? A. Continue the audit using documented information only B. Report the situation to the audit client, auditee and programme manager C. Reduce the audit scope independently D. Record the audit as failed immediately None Q9. During a combined ISO 9001 and ISO 14001 audit, one issue relates to both management systems. How can the finding be raised? A. As separate findings or as one combined finding, according to the audit arrangements B. Only against the standard with the larger scope C. Only against ISO 9001 because it is the primary standard D. Only as two separate findings in all cases None Q10. A Stage 2 audit ends with a major nonconformity, but the certification body cannot verify the correction and corrective action within six months. What is required before certification can be recommended? A. Certification followed by verification during surveillance B. Downgrading the finding to a minor nonconformity C. Conducting another Stage 2 audit D. Restarting the certification application process None Time's up No comments Share 0
Leave a reply