Free LEED AP BD+C Sample Questions and Answers September 4, 2026 Posted by 3FOLD No comments Welcome to the LEED AP BD+C practice quiz. Enter your details, then work through all 10 questions — we'll email you the score and a full explanation for every question. Full Name Email Mobile Number 1. A developer wants to certify a 4,000 sq ft prefabricated classroom building that is designed to be dismantled and re-erected on another site after ten years. What stands in the way? A. Nothing stands in the way, because the building comfortably exceeds the minimum project size B. LEED is open only to buildings in a permanent location on existing land C. The project would have to certify under Interior Design and Construction instead D. The project would have to draw its LEED boundary around the land it occupies first None 2. Every LEED v5 prerequisite and credit is tagged to one or more impact areas, and Integrative Design Process asks the team to set measurable goals addressing all of them. Which of the following is NOT one of the three impact areas? A. Decarbonization B. Quality of life C. Ecological conservation and restoration D. Resilience None 3. The thermal environment option of Occupant Experience asks a project to comply with which standard? A. ASHRAE 55-2023 B. ASHRAE 62.1-2022 C. ASHRAE 90.1-2022 D. ASHRAE 241-2023 None 4. A small all-electric office has no HVAC refrigerants of any kind. The only refrigerant-containing items on site are two domestic-sized break room fridges, each holding well under half a pound. How does the project satisfy Fundamental Refrigerant Management? A. By compiling the full refrigerant inventory and evaluating lower-GWP alternatives with the owner B. By replacing the two fridges with models that contain no refrigerant at all C. Through the no-refrigerants route, since units under 0.5 lb do not disqualify it D. It does not have to: buildings with no mechanical cooling are exempt from this prerequisite None 5. Resilient Spaces offers a point for designing and commissioning a building management mode that protects occupants from which episodic outdoor condition? A. Flooding B. Wildfire smoke C. High winds D. Extreme heat None 6. A project plants only drought-tolerant native species and lays a temporary drip line that will be lifted once the planting is established, eighteen months after handover. No permanent irrigation system is installed. Does this satisfy the outdoor water part of Minimum Water Efficiency? A. Yes, because temporary watering within a two-year establishment period is allowed on the no-irrigation route B. No, because any irrigation pushes the project onto the efficient irrigation route, where a 30% reduction must be shown C. No, because the no-irrigation route permits no watering whatsoever once the landscape is handed over D. Yes, but only if the project also demonstrates a 30% cut against its theoretical irrigation requirement None 7. Rainwater Management asks a project to retain the runoff from a given percentile rainfall event on site. Which of the following counts as retaining it? A. Infiltrating it into the ground through permeable paving B. Holding it in a detention basin and releasing it slowly to the storm sewer C. Piping it to the municipal treatment works D. Channelling it along a vegetated swale that discharges beyond the site None 8. A manufacturer supplies a datasheet giving its product's recycled content and a carbon figure the manufacturer calculated itself. Why can the team not use it as the product-specific environmental product declaration its embodied carbon documentation calls for? A. Because an EPD must describe a whole product category rather than one manufacturer's product B. Because recycled content may not be reported in an EPD C. Because an EPD must be a Type III declaration verified by an independent third party D. Because an EPD counts only where it covers the full life cycle through demolition and disposal None 9. A project fits every outdoor air fan system with a sensible-only heat recovery device rated at 72% effectiveness, complete with bypass control. Does the ventilation energy recovery option of Reduce Peak Thermal Loads reward it? A. Yes, because the option is met at 70% and bypass control has been provided B. No — sensible-only recovery must reach 75%, not 70% C. No, because the option accepts enthalpy recovery devices only D. Yes, but only once fan systems supplying under 15% of the outdoor air are excluded None 10. A project's development footprint sits entirely on a previously developed infill site, and part of that footprint falls within 50 feet of a wetland. Can the project still earn Sensitive Land Protection? A. No — the 50-foot wetland setback binds every project, whatever the history of the site B. Only if the work inside the setback is limited to minor improvements such as a footpath C. Only if 40% of the wetland buffer is protected from all construction activity D. Yes — a previously developed site qualifies under its own option None Time's up No comments Share 0
Leave a reply