LEED AP BD+C Practice Questions: Integrative Process September 1, 2026 Posted by 3FOLD No comments Welcome to the LEED AP BD+C practice quiz. Enter your details, then work through all 8 questions — we'll email you the score and a full explanation for every question. Full Name Email Mobile Number 1. A New Construction project has documented EAp1, EAp5 and MRp2, but the team has decided not to pursue LTc4 Transportation Demand Management. Which emissions sources will feed the 25-year projection USGBC returns under IPp3 Carbon Assessment? A.Operational carbon, refrigerants, embodied carbon and transportation, using default commuting assumptions B.Operational carbon, refrigerants and embodied carbon only C.Operational carbon and embodied carbon only, since refrigerant data is reported through the enhanced refrigerant credit D.Embodied carbon and transportation only, since operational figures are drawn from metered data after occupancy None 2. A team has documented demographics, local infrastructure and land use, human use and health impacts, and occupant experience for the community around its site. The owner now asks what performance level the project must reach for IPp2 Human Impact Assessment to be satisfied. What is the correct answer? A.At least 15% of the jobs created by the project must be filled by hires drawn from the assessed community B.No threshold applies; the findings must inform design where possible and be described C.At least ten inclusion strategies beyond local accessibility code must be adopted from four listed categories D.At least two priority social inequities must be selected and addressed through documented design strategies None 3. A coastal project's climate and natural hazard assessment identifies eleven hazards that could affect the site or building function over the projected service life. What does IPp1 require the team to do with that list? A.Select at least two priority hazards and address them through proposed design strategies B.Select the single hazard with the highest risk rating and design the building envelope around it C.Address every hazard identified in the assessment through a documented design response D.Address only those hazards whose risk rating exceeds the threshold set by the chosen IPCC scenario None 4. A Core and Shell developer plans to hand each incoming tenant a sustainability guide at the fit-out kick-off meeting, once that tenant's space has been leased. Why does this fail IPp4 Tenant Guidelines? A.The guidelines must be created and shared with all tenants before the lease is signed B.The guidelines must be issued before the base building's construction documents are complete C.The guidelines must be issued at the same moment the green lease is executed, not afterwards D.The guidelines must be issued before the design charrette so that tenants can take part in it None 5. During predesign, a project holds its charrette. Attending are the owner's representative and four staff from the architecture practice: two designers, a specification writer and an in-house sustainability lead. Does this meet the design charrette requirement of IPc1 Integrative Design Process? A.Yes, because the owner's representative plus four further attendees satisfies the participation requirement B.No, because a charrette must be repeated at the end of design development to count C.No, because four key perspectives means four disciplines, and only the architect is represented here D.Yes, because an in-house sustainability lead may stand in for any perspectives that are not present None 6. Two items in the Integrative Process, Planning and Assessments category exist only in BD+C: Core and Shell and have no counterpart in New Construction. Which two? A.The Human Impact Assessment and Green Leases B.Tenant Guidelines and the Integrative Design Process C.Tenant Guidelines and Green Leases D.The Climate Resilience Assessment and the Carbon Assessment None 7. A project's IPp3 carbon assessment shows that embodied carbon makes up the largest share of its cumulative 25-year emissions. What does the prerequisite itself require the team to do about that result? A.Cut embodied carbon by 20% against the reference before certification can be awarded B.Re-run the projection over a longer analysis period to confirm that the finding holds C.Produce a decarbonization plan aimed at the largest single source the assessment identifies D.Nothing further, because IPp3 requires the assessment, not a reduction measured against it None 8. A Core and Shell team has already documented achievement under IPc2 Option 1, Standard Green Lease, and now expects Green Lease Leaders Gold recognition under Option 3 to add to that total. What is wrong with the expectation? A.Green Lease Leaders recognition counts only once every tenant lease has been executed B.Option 3 may be combined only with Option 2, and only for the single executed lease C.Recognition under Option 3 supersedes IPp4, so the tenant guidelines must be re-documented D.Option 3 is an alternative to Options 1 and 2, so its achievement cannot be stacked on them None Time's up No comments Share 0
Leave a reply