LEED AP BD+C Practice Questions: Location and Transportation September 1, 2026 Posted by 3FOLD No comments Welcome to your LEED AP BD+C Practice Questions: Location and Transportation Full Name Email Mobile Number 1. Under Sensitive Land Protection Option 2, what setback distances define the water body and wetland criteria that a previously undeveloped site must stay clear of? A.100 feet (30 m) from a water body and 50 feet (15 m) from a wetland B.50 feet (15 m) from a water body and 100 feet (30 m) from a wetland C.100 feet (30 m) from both a water body and a wetland D.300 feet (90 m) from a water body and 100 feet (30 m) from a wetland None 2. A previously undeveloped site contains 3.0 acres of unstable slopes between 15% and 25% and 1.5 acres of unstable slopes steeper than 25%. What total slope area must be protected from all development and construction activity? A.1.8 acres B.2.4 acres C.2.7 acres D.2.1 acres None 3. A construction team documents that residents of the project's own administrative district fill 15% of the construction jobs the project creates, and that participants in a registered apprenticeship programme performed 12% of total construction hours. Which conclusion is correct? A.Both the local economy path and the equitable construction option are satisfied, because each records 15% of construction activity B.The local economy path is satisfied, but the equitable construction option is not, because apprenticeship is measured against hours worked C.Neither is satisfied, because both routes measure a share of total construction hours worked D.The equitable construction option is satisfied, but the local economy path is not, because local hiring is measured against hours worked None 4. A functional entry sits within 0.25 miles (400 m) walking distance of one stop on a single qualifying bus route. The route runs 95 trips in each direction Monday through Thursday, 84 in each direction on Friday, 50 in each direction on Saturday and 38 in each direction on Sunday. Which trip counts apply to the calculation? A.84 weekday and 38 weekend trips B.95 weekday and 50 weekend trips C.84 weekday and 50 weekend trips D.168 weekday and 100 weekend trips None 5. An office project qualifies as exempt from the Transportation Demand Management assessment. What is the effect of that exemption? A.The project is awarded the credit automatically and may pursue further measures B.The project must still complete the assessment, since only projects in a government-mandated programme are exempt C.The project skips the assessment but must still meet a measure's requirements to earn anything D.The project may not pursue the credit, since the assessment is the basis of all its achievement None 6. A commercial project leases 46 off-street parking spaces in a nearby garage that its occupants use, and there are 12 public on-street spaces along its frontage. How many spaces must receive installed electric vehicle supply equipment to reach the higher of the two Electric Vehicles tiers? A.5 spaces B.3 spaces C.4 spaces D.6 spaces None 7. A commercial project owns 40 off-street parking spaces and wants to combine one tier of installed charging equipment with one tier of electric vehicle readiness. What is the minimum number of parking spaces that must be dedicated in total? A.6 spaces B.12 spaces C.10 spaces D.14 spaces None 8. A project documents Walkable Location through the diverse uses path rather than Walk Score. Within 0.5 miles (800 m) walking distance it identifies 4 restaurants, 3 pharmacies, 2 banks and 2 supermarkets, spanning three of the five categories. How many uses may be counted? A.4 uses B.9 uses C.11 uses D.8 uses None Time's up No comments Share 0
Leave a reply