LEED AP BD+C Practice Questions: Materials and Resources September 3, 2026 Posted by 3FOLD No comments Welcome to the LEED AP BD+C practice quiz. Enter your details, then work through all 13 questions — we'll email you the score and a full explanation for every question. Full Name Email id Mobile Number 1. Which material is NOT one of the six streams a project must provide dedicated storage and collection for under Planning for Zero Waste Operations? A. Corrugated cardboard B. Organics and food waste C. Mercury-containing lamps D. Glass None 2. A project is located in a municipality with no organics hauling service of any kind. The owner proposes to omit an organics storage area and instead direct occupants to place food waste in the commingled recyclables bin. How does this affect the waste prerequisite? A. It complies, because commingling is permitted wherever local conditions require it B. It complies, because the organics stream is waived where no hauler serves the area C. It fails, but only because the commingled bin is not accessible to janitorial staff D. It fails, because organics storage space is still required and may not be commingled None 3. Which statement correctly describes what Quantify and Assess Embodied Carbon requires? A Cradle-to-grave global warming potential for all building systems, with a reduction demonstrated B Cradle-to-gate global warming potential for interior finishes and mechanical equipment, with no reduction required C Cradle-to-gate global warming potential for structure, enclosure and hardscape, with no reduction required D Jobsite fuel and utility tracking during construction, with no reduction required None 4. A team has produced a bill of materials listing quantities and A1–A3 global warming potential for every required material type in the structure, enclosure and hardscape. What must the team still deliver to satisfy the embodied carbon prerequisite? A. Evidence that global warming potential was cut by at least 20 percent against a baseline B. Identification of the top three embodied carbon sources and strategies considered C. An extension of the assessment through the end-of-life stages, C1 to C4, for each material D. A product-specific environmental product declaration for every material in the bill of materials None 5. A salvaged steel frame recovered from another site is incorporated into a project that is running a whole-building life-cycle assessment. How is that frame treated? A It is excluded from the assessment entirely, since salvaged material carries no reportable impact B It is assigned zero global warming potential across every life-cycle stage in both the baseline and proposed models C It is assigned the industry-average intensity for structural steel, since no product-specific declaration exists D It is assigned zero global warming potential for A1–A3, but transport and end of life still count None 6. An existing building has 50,000 square feet of floor area. A structural engineer deems 10,000 square feet of it unsound and it is removed from the calculation. The team retains 26,000 square feet of existing structure and enclosure, and incorporates reused structural and enclosure material brought in from off site equivalent to a further 2,000 square feet. What existing building reuse percentage does the project demonstrate? A. 70 percent B. 52 percent C. 56 percent D. 65 percent None 7. During demolition a project recovers 40 tons of sound face brick and sells it to an off-site architectural reclamation yard. Under which Materials and Resources item does that tonnage count? A Building and Materials Reuse only B Construction and Demolition Waste Diversion only C Both, since the brick is salvaged and reused D Neither, since sold material is treated as a commercial transaction None 8. In the building reuse calculation, which retained element does NOT count toward the reused area? A. Existing window assemblies B. Existing exterior cladding panels C. Existing roof decking D. Existing load-bearing masonry walls None 9. A New Construction project verifies that more than 90 percent of its paints and coatings and more than 90 percent of its flooring meet the emissions criteria, along with more than 90 percent of its insulation and more than 85 percent of its adhesives and sealants. Its ceilings reach 88 percent. What is the outcome under Low-Emitting Materials? A The project complies, because three categories clear the higher share B The project complies, because insulation and adhesives substitute for the shortfall in ceilings C The project does not comply, because adhesives and sealants must also clear the higher share D The project does not comply, because ceilings must also clear the higher share None 10. A millwork supplier furnishes documentation showing that its composite wood casework complies with the CARB airborne toxic control measure for composite wood products. Is that sufficient for the composite wood category under Low-Emitting Materials? A Yes, because CARB compliance is the referenced standard for composite wood B No, because certification as ultra-low-emitting or no-added-formaldehyde is required C No, because composite wood must instead be tested to the CDPH emissions method at 14 days D Yes, provided the product was manufactured within the previous three years None 11. A ceilings category totals 5,000 square feet across four products: 1,000 square feet with a multi-attribute score of 3, 1,500 square feet with a score of 2, 500 square feet with a score of 4, and 2,000 square feet with no qualifying attributes. What is the category adjusted value? A. 160 percent B. 60 percent C. 225 percent D. 267 percent None 12. A project generates 1,000 tons of construction and demolition material and diverts 780 tons of it. Of the diverted tonnage, 140 tons were salvaged or source-separated to single-material recyclers. What does the project achieve under Construction and Demolition Waste Diversion? A. The higher tier, because diversion exceeds 75 percent of total material B. The higher tier, because salvaged and source-separated material exceeds 10 percent of total material C. The lower tier, because source-separated material is under a quarter of the diverted tonnage D. Nothing, because source-separated material is under a quarter of total material generated None 13. A project generates 1,000 tons of construction and demolition material. It source-separates 250 tons to single-material recyclers and sends the remaining 750 tons to a mixed waste processing facility that advertises a 70 percent recovery rate but holds no third-party verification of it. What diversion rate may the project claim? A. 25 percent B. 35 percent C. 78 percent D. 51 percent None Time's up No comments Share 0
Leave a reply