LEED AP BD+C Practice Questions: Water Efficiency September 1, 2026 Posted by 3FOLD No comments Welcome to the LEED AP BD+C practice quiz. Enter your details, then work through all 9 questions — we'll email you the score and a full explanation for every question. Full Name Email Mobile Number 1. Under Water Metering and Reporting, how long must a project commit to sharing whole-project water use data with USGBC, and what brings that commitment to an end? A.Annually for five years, with no provision for ending it early B.Annually for five years, or until ownership or the lessee changes C.Annually for three years, or until the project applies for recertification D.Monthly for five years, starting on the date certification is awarded None 2. Water Metering and Leak Detection can be earned by either of two routes. What coverage does each route require? A.Submeters on at least 50% of indoor fixtures and fittings, or leak sensors on at least 80% of flush fixtures B.Submeters on at least 80% of indoor fixtures and fittings, together with leak sensors on at least 50% of flush fixtures C.Submeters on at least 80% of indoor fixtures and fittings, or leak sensors on at least 50% of flush fixtures D.Submeters on at least 80% of flush fixtures, or leak sensors on at least 80% of indoor fixtures and fittings None 3. A project's fixture and fitting calculation returns a baseline case of 1,250 gallons per day and a design case of 950 gallons per day. What aggregate reduction should the team report on the performance path of Minimum Water Efficiency? A.32% B.24% C.76% D.30% None 4. An office has 100 full-time equivalent occupants, split evenly between male and female. Each male occupant is assumed to make one water closet use and two urinal uses per day; each female occupant makes three water closet uses per day. The project installs 1.28 gpf water closets and 0.125 gpf urinals. Using the prerequisite baseline flush volumes, what aggregate reduction does the project achieve for these two fixtures? A.27% B.56% C.64% D.36% None 5. A residential project has 90 dwelling units: 60 are two-bedroom and 30 are one-bedroom. Occupancy is not otherwise known, and each resident is assumed to make five water closet uses per day. What is the baseline daily water closet volume for the fixture calculation? A.1,920 gallons B.1,200 gallons C.1,536 gallons D.960 gallons None 6. A design team specifies every installed fixture and fitting at or below the prescriptive maximum flush and flow rates and concludes that Minimum Water Efficiency is satisfied. What is still outstanding? A.The equipment and process requirements and one outdoor water option still apply B.Nothing further — the prescriptive maximums on their own satisfy the prerequisite C.A 20% aggregate reduction against the fixture baseline must still be demonstrated D.Permanent submeters must be installed so the fixture reduction can be verified None 7. A New Construction project models a 42% whole-project water use reduction under Option 1 of Enhanced Water Efficiency and also wants to document an on-site reuse system under the credit's water reuse option. How should the reviewer treat this? A.The combination is acceptable provided no saving is counted under both options B.The combination is acceptable, but the total is capped at the Option 1 maximum C.Option 1 may not be combined with Options 2 through 6; the team must pick one route D.Alternative water sources may never be counted in a whole-project reduction None 8. A project is documenting the performance path of Minimum Water Efficiency. Which of these specifications adds nothing at all to the aggregate reduction? A.A urinal at 0.50 gpf B.A showerhead at 2.00 gpm C.A kitchen faucet at 1.8 gpm D.A public lavatory faucet at 0.50 gpm None 9. A project with irrigation in its scope installs leak sensors serving 60% of its flush fixtures, gives the facility manager real-time access to the data, and prepares an action plan for remedying detected leaks. Does this satisfy the sensor route of Water Metering and Leak Detection? A.No — the irrigation point of entry and each makeup water system must also be covered B.Yes — 60% coverage exceeds the 50% flush fixture threshold, so the route is satisfied C.No — sensors must serve each fixture individually rather than a whole restroom D.No — flush fixture coverage must reach 80% where irrigation is within the project scope None Time's up No comments Share 0
Leave a reply