LEED AP® (BD+C) v5 Exam Practice Questions October 6, 2026 Posted by 3FOLD No comments Fill in the form below to unlock your quiz.We'll email your full results — with a detailed explanation for every question — as soon as you finish. Full Name Email Address Mobile Number Q1. Under WEp1, what must the permanent water meters cover? A. Potable water supplied to indoor fixtures and fittings B. Potable water supplied to the building and grounds C. Potable and alternative water supplied to the building and grounds D. Water supplied to at least 80% of indoor fixtures and fittings None Q2. A project is providing an EV-ready parking space under LTc5 Option 2. Which installation meets the requirement? A. 120 volts, 40-amp capacity, with conduit to a junction box B. 208–240 volts, 20-amp capacity, with conduit to a junction box C. 208–240 volts, 40-amp capacity, with an installed Level 2 charger D. 208–240 volts, 40-amp capacity, with conduit to a junction box None Q3. A deconstruction project generates 900 tonnes of material. It reuses 180 tonnes on the same site. Of the remaining material, 540 tonnes are diverted from landfill. What diversion rate should be reported under MRc5? A. 60% B. 75% C. 80% D. 85% None Q4. Under EAc1 for a Core and Shell project, what does Option 2 Electrification Readiness require? A. Installed systems serving at least 30% of the peak heating load B. Infrastructure supporting future systems averaging at least 1.3 COP C. Infrastructure supporting future systems averaging at least 1.8 COP D. Elimination of all combustion systems within the base building None Q5. A multiple-zone recirculating system is being evaluated under EQc1 Option 1. How should the required increase be applied? A. Increase every zone's supply airflow by 15% B. Multiply only the critical zone's Vbz by 1.15 C. Multiply Vot by 1.15 without changing zone calculations D. Multiply Vou and critical-zone Vbz by 1.15, then recalculate None Q6. A project uses a vegetated roof as part of its heat-island strategy. Which statement best reflects the SSc5 Option 1 calculation approach? A. Vegetated roof area can contribute to the weighted qualifying area B. Vegetated roof area is excluded from all qualifying calculations C. Only nonroof measures are counted toward the required target D. Roof measures are counted at their full area without weighting None Q7. During the IPc1 discovery phase, when does the discovery phase occur? A. After construction documents are completed B. Before schematic design and as an expansion of predesign C. During construction and alongside commissioning activities D. After occupancy and before performance verification begins None Q8. A project qualifies for MRc2 Option 2 through Path 1 and also qualifies for Path 2. Can the project combine the points from both paths? A. Yes, if the combined total remains within the credit maximum B. Yes, provided each path uses different material categories C. No, because the two paths cannot be combined D. No, unless the project also earns the prerequisite None Q9. A certified Passive House project wants to claim both paths of EQc4 Option 3 without performing either outage model. What is the result? A. Both paths are earned through the Passive House certification B. Only the cold-weather path is earned; the summer model is still required C. Only the summer path is earned; the winter model is still required D. Neither path is earned because certification provides no substitution None Q10. Under LTc4 Option 2 Path 1, what must the bicycle network reached from the project provide? A. A contiguous network of at least one mile on 25-mph streets B. A network of any length within 300 feet of a functional entry C. A contiguous network of at least three miles on 35-mph streets D. A contiguous network of at least three miles on 25-mph streets None Time's up No comments Share 0
Leave a reply