LEED Process — 7 questions September 1, 2026 Posted by 3FOLD No comments Welcome to the LEED AP BD+C practice quiz. Enter your details, then work through all 7 questions — we'll email you the score and a full explanation for every question. Full Name Email Mobile Number 1. A whole-building project has 100,000 sq ft of gross floor area. The contracted scope finishes 62,000 sq ft, of which 40,000 sq ft is clinical space and 22,000 sq ft is general office. The remaining 38,000 sq ft is handed over without finishes or plumbing fixtures and is expected to be fitted out later as clinical space. Which statement is correct? A.The project registers under Core and Shell and must meet the healthcare project type requirements. B.The project registers under New Construction and must meet the healthcare project type requirements. C.The project registers under New Construction, and no project type requirement is triggered because finished clinical space is only 40% of gross floor area D.The project registers under New Construction, with the clinical and office areas each assessed against their own project type requirements. None 2. An owner holds a 14-acre parcel. The building seeking certification occupies about 5 acres, and a surface car park used daily by the building's staff sits immediately beside it. The team proposes drawing the LEED project boundary to exclude the car park so that the paved and roof area totals for Heat Island Reduction become easier to satisfy. How should this proposal be assessed? A.It is acceptable, provided the excluded car park is clearly identified on the site plan as part of the property boundary. B.It is not acceptable: the car park is contiguous land serving typical operations, so excluding it breaches MPR 2. C.It is acceptable, because the car park sits outside the extent of construction disturbance recorded for the project. D.It is not acceptable: the LEED project boundary must coincide with the property boundary, so all 14 acres are included. None 3. A 180-room hotel is in design and no occupancy study is available, so the team uses the LEED default occupancy counts. What regular building occupant figure should be carried through the application? A.162 as the daily average, with 270 applied as the peak total. B.180, one occupant per guest room, applied as both the daily average and the peak total. C.270, applied as both the daily average and the peak total. D.162, applied as both the daily average and the peak total. None 4. A New Construction project satisfies every prerequisite and earns 92 points. It reaches the required Electrification and Enhanced Energy Efficiency thresholds and achieves a 24% embodied carbon reduction, but its renewable energy procurement covers 85% of site energy use. Which statement about its certification is correct? A.It certifies Gold, because Platinum also requires 100% of site energy from Tier 1, Tier 2 and Tier 3 renewables. B.It certifies Platinum, because the point total is the only test applied at the top level. C.It certifies Platinum, because the embodied carbon reduction exceeds the required 20% and offsets the renewable energy shortfall. D.It certifies Gold, because a project cannot be awarded a level whose point band it exceeds None 5. Which change to LEED can be issued through addenda, taking effect immediately, rather than passing through the LEED balloting procedures? A.A revision to the number of points that an existing credit carries. B.The addition of a new prerequisite to an existing rating system C.Publication of an alternative compliance path for a credit. D.An increase in the technical stringency of an existing credit's requirements. None 6. A team's proposed water reuse arrangement is not addressed by any compliance path written into the credit they wish to pursue. Working through the correct order of steps, what should the team do before asking USGBC to determine an equivalency? A.Look in the Credit Library and project priority library for a published alternative compliance path. B.Submit the arrangement through the innovative strategies pathway of Project Priorities instead. C.Apply the addenda published closest to the date of the design phase review rather than those in force earlier. D.Re-register the project under a different rating system adaptation whose language covers the arrangement. None 7. To pursue Enhanced Air Quality a team raises breathing zone outdoor air 15% above the minimum across the occupied spaces. The energy modeller reports that the added conditioning load erodes the project's modelled savings, and that the model now clears the minimum energy efficiency prerequisite by only a narrow margin. Which consideration should govern the team's decision? A.Enhanced Air Quality is a prerequisite, so modelled energy savings must be given up to protect it. B.Outdoor air is modelled identically in the baseline and the proposed design, so ventilation cannot affect the energy result either way. C.The minimum energy efficiency prerequisite must still be met; the air quality credit is optional and can be released. D.A 15% increase in outdoor air qualifies as exemplary performance, recovering the lost points through Project Priorities. None Time's up No comments Share 0
Leave a reply