• Home
  • About Us
  • AACE
    • CCP Exam Preparation
  • ASQ
    • CMQ/OE Exam Preparation
    • CSSGB Exam Preparation
    • CSSBB Exam Preparation
  • IRCA
    • ISO 9001 QMS Lead Auditor
    • ISO 14001 EMS Lead Auditor
    • ISO 27001 ISMS Lead Auditor
    • ISO 45001 OHSMS Lead Auditor
  • Transition
    • ISO 9001:2026 QMS Transition Training
    • ISO 14001:2026 EMS Transition Training
  • PMI
    • PMP Exam Preparation
  • GBCI
    • LEED GA Exam Preparation
    • LEED AP (BD+C) Exam Preparation
    • LEED Combo (GA + AP) Exam Preparation
  • Course Calendar
  • Articles
  • Webinar
  • Testimonials
  • Contact us
Community Join 3FOLD Training Schedules on WhatsApp — get every course batch update first 3FOLD Training Schedules on WhatsApp Join now

Call or WhatsApp: UAE 971.50.4819989 | India 91.9176257536

online@3foldtraining.com
WhatsApp
3FOLD Training3FOLD Training
3FOLD Training3FOLD Training
  • Home
  • About Us
  • AACE
    • CCP Exam Preparation
  • ASQ
    • CMQ/OE Exam Preparation
    • CSSGB Exam Preparation
    • CSSBB Exam Preparation
  • IRCA
    • ISO 9001 QMS Lead Auditor
    • ISO 14001 EMS Lead Auditor
    • ISO 27001 ISMS Lead Auditor
    • ISO 45001 OHSMS Lead Auditor
  • Transition
    • ISO 9001:2026 QMS Transition Training
    • ISO 14001:2026 EMS Transition Training
  • PMI
    • PMP Exam Preparation
  • GBCI
    • LEED GA Exam Preparation
    • LEED AP (BD+C) Exam Preparation
    • LEED Combo (GA + AP) Exam Preparation
  • Course Calendar
  • Articles
  • Webinar
  • Testimonials
  • Contact us

LEED AP BD+C Practice Questions: Energy and Atmosphere

September 3, 2026 Posted by 3FOLD No comments

Welcome to the LEED AP BD+C  practice quiz. Enter your details, then work through all 18 questions — we'll email you the score and a full explanation for every question.

1. A team is assembling its submission for EAp1 Operational Carbon Projection and Decarbonization Plan. Its consultant has delivered annual figures expressed in source energy and broken out by fuel type only. What has to change before the estimate can be submitted to USGBC?

2. A project cannot satisfy the electrification route, so it must produce a decarbonization plan for the operational carbon prerequisite. What does that plan have to be?

3. Which statement correctly describes how a BD+C project determines the edition of ANSI/ASHRAE/IES 90.1 it may use for EAp2 Minimum Energy Efficiency?

4. A project documents EAp2 Minimum Energy Efficiency using the Energy Cost Budget method. The team later decides it would like to pursue EAc3 Enhanced Energy Efficiency through whole-building energy simulation measured against the published Performance Index targets. Why is that route unavailable?

5. An owner is setting up fundamental commissioning for a new office building and asks the design team to confirm what EAp3 actually obliges the project to do. Which description is accurate?

6. A commercial project meters total building electricity and its submetered electrical end uses, and separately meters natural gas and district steam. Which combination of recording intervals and durations satisfies EAp4 Energy Metering and Reporting?

7. A project's mechanical schedule specifies packaged rooftop units charged with R-410A, a refrigerant with a global warming potential of 2,088. What does EAp5 Fundamental Refrigerant Management require the team to do about it?

8. A New Construction project has no on-site combustion equipment of any kind. Space heating is delivered by air-source heat pumps of 800,000 Btu/h capacity operating at a coefficient of performance of 2.0, and service water heating by electric resistance heaters of 200,000 Btu/h capacity at a coefficient of performance of 1.0. Does the project meet EAc1 Option 1, No On-Site Combustion?

9. Two design schemes are compared under EAc2 Reduce Peak Thermal Loads, Option 4, using the energy simulation path. Scheme A returns a peak thermal load Performance Index of 0.45 and Scheme B returns 0.32. Which statement is correct?

10. A New Construction team documents the energy prerequisite through Appendix G and models a 30% improvement beyond its Performance Index target. The figure includes the output of the rooftop photovoltaic array, and the team expects the top of Enhanced Energy Efficiency. Why is that expectation wrong?

11. A New Construction team lists the ASHRAE 90.1 Section 11 measures it has achieved and proposes to convert all of them into Enhanced Energy Efficiency through the prescriptive route: improved HVAC, improved service water heating, an upgraded envelope, on-site renewables and continuous energy monitoring. Which of those five will the credit decline to count?

12. In Renewable Energy, an off-site renewable electricity supply falls into Tier 3 rather than Tier 2 when which condition applies?

13. A Core and Shell project estimates total building energy use at 4,000,000 kWh per year, and estimates that the meters serving base building systems will account for 700,000 kWh per year. The owner contracts 480,000 kWh per year of qualifying renewable supply. What percentage does the project claim in Renewable Energy?

14. A Core and Shell owner designates an independent commissioning provider in predesign, and the provider completes enhanced commissioning of the MEP systems to ANSI/ASHRAE/IES 202-2024, sampling 25% of contractor documentation and attending four construction milestone meetings. The owner declines to commission the building enclosure beyond what the prerequisite required. What does the project earn in Enhanced Commissioning?

15. A project models a peak electrical demand of 850 kW and wants to reach the higher of the two electric energy storage thresholds in Grid Interactive. What is the minimum storage capacity it must install?

16. What does the power resilience option of Grid Interactive require a project to demonstrate?

17. A project's HVAC refrigerants consist of a chiller holding 100 lb of R-134a, with a global warming potential of 1,430, and a carbon dioxide system holding 900 lb of R-744, with a global warming potential of 1. The applicable benchmark for HVAC is 700. What does the low-GWP route give this project?

18. A Core and Shell project targeting Platinum electrifies its space heating with heat pumps above the required efficiency, but keeps a gas-fired service water heater. The team intends to skip the decarbonization plan narrative on the grounds that the project is designed for electrification. Is that reasoning sound?

clock.png

Time's up

No comments
Share
0

Leave a reply Cancel reply

COURSE ENQUIRY FORM



    Latest Articles

    • Will AI replace project managers? What the 2026 data says
    • AACE CCP Exam Preparation in Qatar
    • ISO 45001 Management of Change: How to Audit Clause 8.1.3
    • AACE CCP Exam Preparation Online: Video Lessons, Study Guide and Mock Exams
    • Audit Contractor Management in ISO 45001
    • Is LEED Too Difficult for Someone New to Sustainability?

    Have a look at our courses

    Certified Cost Professional
    Certified Manager of Quality
    Certified Quality Auditor
    Certified Six Sigma Green Belt
    Certified Six Sigma Black Belt
    FIDIC Contract Management
    ISO 9001:2015 QMS Internal Auditor
    ISO 9001:2015 QMS Lead Auditor
    ISO 45001:2018 OHSMS Lead Auditor
    ISO 14001:2015 EMS Lead Auditor
    LEED Green Associate
    LEED Accredited Professional
    Project Management Professional

    QUICK SUPPORT

    3FOLD WhatsApp

    3FOLD Training

    Your Ultimate Resource for Professional Certification and Qualifications.

    Enquire Today!

    whatsapp button

    United Arab Emirates

    1003, Park Avenue,
    Dubai Silicon Oasis, Dubai,
    United Arab Emirates.

    Telephone: +971.4.5776146
    Mobile: +971.50.4819989

    online[at]3foldtraining[dot]com

    Google Map

    India

    Plot No: 1342, HIG,
    TNHB Main Road,
    Sithalapakkam,
    Chennai – 600126.

    Mobile: +91.9176257536
    online[at]3foldtraining[dot]com

    Google Map

    SUPPORT

    Enquiry
    Contact Us
    Certificate Registry
    Privacy Policy
    Refund and Cancellation Policy
    Terms and Conditions

    © 2026 · 3FOLD Training FZE. PMP, PMBOK® Guide, and PMI Authorized Training Partner logo are registered marks of the Project Management Institute, Inc. All other logos are trademarks of their respective owners.

    Press Enter to search · Esc to close

    Learn. Certify. Advance.

    Advance your career with globally recognized certifications

    • PMI Authorized Training Partner
    • CQI IRCA Approved Training Partner
    • AACEI Approved Education Provider
    30,000+ learners · 100+ countries · 4.9★ on Google

    Get course details and expert guidance

    Ask about fees, syllabus, eligibility and the certification path



      Chat on WhatsApp

      We respect your privacy. No spam. Your details are safe with us.

      WhatsApp
      Hello, welcome to 3FOLD!
      How can we assist you?
      Open chat